NEW PROJECTS 

 FP&L Venetian Substation (T-4099)

Technibus, working closely with ABB, Inc. has secured the FP&L order to  the existing Venetian Substation equipment in downtown Miami.  This substation serves approximately a 20 block radius, which includes multiple high-rise condominiums.  Technibus must co-ordinate the connections of the new switchgear units and the existing current limiting reactors.

Los Angeles Metro Blue Line Replacement  (T-4101)

Technibus has been selected by Siemens Industry - Mobility Division to provide the bus duct for the Los Angeles Metro Blue Line Replacement Project.  Scope of supply is the 6-Pole AC bus duct connection between the transformers and the rectifiers on 20 different Traction Power Substations.

Miami/Dade Metro Earlington Line Expansion (T-4108)

Technibus has been selected by Siemens Industry - Mobility Division to provide the bus duct for the Miami/Dade Metro Earlington Line Expansion.  Scope of supply is the 6-Pole AC Bus Duct connection between the transformers and the rectifiers, and the 1-Pole DC bus duct between the rectifiers and the DC switchgear.

Porto Refinery Conversion Project (T-4120)

Technibus has been selected by Fluor Limited - Camberley, UK to provide the bus duct for the Porto Refinery Conversion Project located in Porto, Portugal.  Scope of supply is the AC bus duct connection between the transformers, the neutral resistor cabinet, and the switchgear line up for this substation.

Basin Electric Power Cooperative, Deer Creek Station (T-4128)

Technibus has been selected as the equipment supplier by Basin Electric, Deer Creek Station, to supply the non-segregated phase bus duct.  This project is a 300MW natural gas combined-cycle generation facility located near White, South Dakota, in Brookings County with construction to begin mid-summer 2010.  Technibus will co-ordinate the connections of the new transformers to the new switchgear and motor control centers for 600V and 5kV systems.

Indiana Power & Light (T-4130)

Technibus, working closely with Eaton Electrical, Inc. has secured the IP&L order to the existing West Substation which was taken out of operation after a transformer failure.  Technibus will supply a 15kV, 3000A bus way for connection between existing switchgear and the spare replacement transformer.  Technibus must deliver equipment to site within two weeks to bring equipment back on-line.

 Lawrence Livermore National Laboratory - T200 (T-4172)
 

Technibus was selected to replace existing run of faulted outdoor bus duct consisting of non-segregated 15kV 5000A 3-phase, 3-wire ground and 316 stainless steel enclosures.  The bus duct was designed, fabricated and assembled within three weeks as requested by our customer to bring the equipment back into service.

CUSTOMER FEEDBACK

 En-Sync Group, Inc.

"Great, this is a nice improvement over the 14 weeks quoted! I'm very happy to hear this, as I was going to have to ask you to offer an improvement to help the customer keep the project on track.  This will go a long way.  Thanks again, have a great day!"

 Austin Industrial, Inc.

"Big thanks Jim.  All of us here at Austin really appreciate you and your team at Technibus for getting our site - specific lengths of bus duct splice plates fabricated and shipped out to us via FedEx today as per our time sensitive requirements.  JOB WELL DONE..."

 