South Texas Electric Cooperative (T-3943):

3943 Packaged for South Texas Electric Cooperative, Pearsall Power Plant, packaged with ABB Swgr consisting of (6) runs of 15kv 3200A bus duct, and (5) runs of 600V-3200A bus duct.

The project shipped on 03-30-09 and is scheduled for start-up on 12-01-09.

In addition to our bus duct, we also provided site engineering structural supports and certified seismic calculations. The plant will be connected to the ERCOT grid and supply power and Ancillary Services to STEC's eight cooperative members, helping to serve their 750 MW peak load. The plant is anticipated to run about 4000 hours per year. The first 75 MW of the Pearsall Power Plant is expected to enter commercial operation in late 2009, with the remaining 128 MW beginning commercial operation by the end of 2010.

Copyright 2010 by Technibus, Inc.   |   Privacy Statement  |   Terms Of Use  |   Login